Exterior Waterproofing
Project overview
This project view highlights the main stages of exterior foundation access: controlled excavation, wall preparation and installation of a continuous waterproofing assembly. Exterior work is planned around excavation depth, utilities, access, drainage at the footing and protection of the membrane during backfill.
Related assessment considerations
- Where water first becomes visible
- Interior and exterior access
- Foundation and drainage condition
- Finished materials affected by the work