Skip to content
Exterior Waterproofing Project

Exterior Foundation Waterproofing

Foundation wall preparation and exterior waterproofing membrane installation.

Exterior Waterproofing

Project overview

This project view highlights the main stages of exterior foundation access: controlled excavation, wall preparation and installation of a continuous waterproofing assembly. Exterior work is planned around excavation depth, utilities, access, drainage at the footing and protection of the membrane during backfill.

Related assessment considerations

  • Where water first becomes visible
  • Interior and exterior access
  • Foundation and drainage condition
  • Finished materials affected by the work
Request a Similar Assessment
Request a basement assessment

Tell us where and when the water appears

Share the location, timing, basement finish and any visible cracks, sump-pump concerns or window-well problems. Clear photographs help us understand the request.

  • Brampton property address or postal code
  • Active leak, recurring leak or preventive assessment
  • Interior and exterior photo uploads
Request Assessment